|
The Replacement Window Process
You'll have a Project Manager
dedicated to your home to address any of your concerns throughout
the process, with his personal cell phone number should a situation
arise.

Our
Premier Installation Service includes an industry-leading approach
to every aspect of the project:
Premier Preparation: Safety first for your family and our
crew
- We
safeguard the lawn and flowerbeds at the beginning of
each day
- All nails are
pulled out, not pounded in
- We only remove
the windows we can be replaced that day
Premier
Installation: Who better to install PGT windows than us?
- Complete
removal of the window trim
- Complete
removal of the existing window
- Re-measure
each bare opening before installation to assure proper
fit
- Inspection
of the substrate and window cavity, and needed repairs
made
- Application of a weather-resistant silicon caulk to
window seal
- All
nail fin windows get weather-resistant tape over nail
fins to substrate for added weather protection
- Expert
installation by highly-trained Martin Home Exteriors
window team
- Industry
leading “10 point inspection” walk through
on every window.
100% Cleanup and Completion:
We want you to be 100% satisfied every day we are at your home,
not just after we've left.
- We clean and
safeguard the site at the end of each day
- We
collect nails and any potentially dangerous small debris
using a magnetic wheel
- You
approve final cleaning upon completion; we don't leave
until you are happy.

Your siding will look
just the way you want it. Everything else will be
just the way you had it. And we leave no 'footprints'
behind.
Martin Home Exteriors
|